Work package 4: Demonstration HPD

Tasks:

T4.1: To design and to realize a lab scale HPD by using as much as possible existing components and to equip it with measuring sensors, a data acquisition and a control system.
T4.2: Design and realize a pilot scale HPD within the infrastructure of a branch specific RTO (normally PFI)
T4.3: To perform tests on the lab scale HPD, to follow up on the pilot scale HPD and then to compare performance data with earlier simulation results in order to validate the theoretical concepts.